Saturday, March 19, 2011

Biogas fermentation pit model for pig farm

Biogas fermentation tank model for pig farm.
      Model fermentation pit with gas to be used to promote management of wastewater from pig farms to preserve. Energy and environment were present.
fixed dome pit (Fixed Dome).
      A pit fermentation biogas are encouraged to use farm pig small (farm pig equivalent Fattened not over 500,) with a promote during November. Fri. 2538 to 2544 in the Promote of biogas, farm animals, Part 2: Small Farmers (Phase 1 and Phase 2) which is operated by the Department of Agricultural (A disc.) Ministry of Agriculture. Supported by the project budget. Fund to promote energy conservation. Office of the National Energy Policy (H NGOs.) Or the Energy Policy and Planning Office (EPPO.) Results.

Channel Digester + UASB
      As biogas fermentation pit developed by Service biogas (biogas technology today is the site) consists of two main components work together is a continuous fermentation pit rails (Channel Digester) run continuously. Bo fermented quickly clear water (UASB: Upflow Anaerobic Sludge Blanket), which Bo fermentation has also promoted for use in farm pigs, medium and large since November. Fri. 2538 to 2546 in the Promotion of biogas In farm animals, Part 1: Medium and Large Farm (Phase 1 and Phase 2) project by Service gas or biogas technology facilities. Chiang Mai University. Supported by the project budget. Fund to promote energy conservation. Office of the National Energy Policy (H NGOs.) Or the Energy Policy and Planning Office (EPPO.) Results.

H-UASB
      H-UASB: High suspension solids - Upflow Anaerobic Sludge Blanket.
is well fermented Service gas development by improving the tank fermentation Channel Digester + UASB to support and treatment of waste water with. performance and greater stability. Bo fermentation has started applying them in a farm pig large project, Phase 2 of 2 farms, representing the volume tank fermentation include 12000 delete m. That the tracking performance was well marinated that can worked well beyond expectations. Has been used to promote a large pig farm in a more broadly in the Phase 3 project.
Pond Covered Lagoon.

      Covered Lagoon pit  is a fermented biogas another format. Most of the soil structure as well. Top covered with large pieces of plastic to collect gas that occurs before the gas utilization. Tank bioreactor have been deployed on about 3-5 years ago, is considered to be in the range early. The lifetime of the pond, which estimated that about 15 years now, so do you think about the performance of the Covered Lagoon Pond complete enough And require monitoring of the use of the pond next

No comments:

Post a Comment